cuongtuanphat@gmail.com

0935662666

Junction Tay Ho Project – Landscape Design & Green Wall Construction, Long Thanh, Dong Nai

1. General Project Information

Investor: Junction Tay Ho Project
Location: Pham Van Dong Street, Long Thanh Town, Long Thanh District, Dong Nai Province, Vietnam
Scope of work: Landscape design and construction + Green wall system
Contractor: Cuong Tuan Phat Co., Ltd.
Implementation period: September 2025

2. About the Junction Tay Ho Project

The Junction Tay Ho Project is a premium urban development in Long Thanh, Dong Nai, designed with a vision of a green, modern, and sustainable living environment. Located on the prime Pham Van Dong axis, the project symbolizes balance between architecture and nature — creating a refreshing living space in the heart of an industrially developing region.

To achieve the best landscape quality, the investor partnered with Cuong Tuan Phat Co., Ltd., a professional contractor specializing in landscape design and construction and green wall installation for factories, residential areas, and resorts across Vietnam.

3. Scope of Work

Within the Junction Tay Ho project, Cuong Tuan Phat is responsible for:

  • Comprehensive landscape design: layout planning for trees, pathways, water features, and garden zones.

  • On-site landscape construction: executed according to approved drawings with optimal plant selection for Dong Nai’s climate.

  • Green wall system installation: modern modular vertical garden setup enhancing building façades and internal courtyards.

  • Landscape maintenance: periodic lawn trimming, pruning, and irrigation system upkeep.

👉 Learn more: Professional grass installation services

4. Design Style & Construction Solutions

The Junction Tay Ho landscape follows a design philosophy that harmonizes nature – architecture – community.
Green areas are evenly distributed to improve microclimate, reduce surface temperature, and enhance residents’ well-being.

Key solutions applied:

  • Vertical green wall systems with automatic irrigation.

  • Selected plant species well-suited to Dong Nai’s tropical climate (e.g., palm trees, ferns, peace lilies, and ornamental grass).

  • Durable, aesthetic construction grass ensuring long-term greenery and easy maintenance.

🔗 Related services:
Factory landscape construction
Industrial park landscape construction
Landscape maintenance and care

5. Cuong Tuan Phat’s Role in the Project

As a leading landscape contractor in Southern Vietnam, Cuong Tuan Phat plays not only the role of construction executor but also a strategic green solutions consultant for the Junction Tay Ho development.

Our commitments include:

  • Use of certified materials and plant sources.

  • Safe and on-time construction delivery.

  • Post-handover maintenance to ensure lasting landscape quality.

👉 Explore more: Full-service landscape design & construction

6. Project Timeline

  • Phase 1 (Sep 2025): Site survey and 2D–3D landscape design.

  • Phase 2 (Oct–Dec 2025): Landscape and green wall construction, irrigation system installation.

  • Phase 3 (Jan 2026): Final inspection, handover, and operational maintenance.

7. Conclusion

The Junction Tay Ho Project stands as a testament to the expertise and reliability of Cuong Tuan Phat Co., Ltd. in landscape design, construction, and green wall solutions in Dong Nai.

With a skilled team of engineers, architects, and horticultural specialists, we take pride in delivering sustainable, aesthetic, and eco-friendly environments that add real value to both investors and communities.

Contact for professional landscape services in Dong Nai:
CUONG TUAN PHAT CO., LTD.

  • Address: 39C, Group 9, Quarter 2, Tam Hiep Ward, Dong Nai Province, Vietnam
  • Representative Office: 2/44 Thuy Loi, Quarter 3, Phuoc Long Ward, Ho Chi Minh City, Vietnam
  • Tax Code: 3602599107
  • Hotline: +84 935 662 666
  • Email: cuongtuanphat@gmail.com
  • Website: https://cuongtuanphat.com

Chi tiết dự án

  • Investor: Junction Tay Ho Project
  • Location: Pham Van Dong Street, Long Thanh Town, Long Thanh District, Dong Nai Province, Vietnam
  • Scope of work: Landscape design and construction + Green wall system
  • Contractor: Cuong Tuan Phat Co., Ltd.
  • Implementation period: September 2025
logo
logo
logo
logo
logo
0935662666
0935662666